Building the Roadbed79 views
|
|
Construction Track on Trestle, and one Retaining Wall96 viewsPhoto from Railroad Gazette May 6, 1904
|
|
Finished Retaining Wall and Overhead Crossing86 viewsPhoto from Railroad Gazette May 6, 1904
|
|
Market Street Station during the Track Elevation99 viewsUntil 1892 all PRR trains, passenger and freight operated through Newark to Jersey City on two tracks at grade level with many road crossings. In 1892 the PRR built a freight bypass, the Waverly and Passaic branch, from the main line at McClelland St. (aka Neck Lane) to Kearney. In 1902 decided to elevate the tracks through Newark and adding two more tracks. The picture looking east, probably taken from the CNJ bridge, shows the original 2 track main with the market Street passenger station and Alling St. freight house. Alongside the in service main can be seen the stonework for the new elevation.
Description from ā€ˇPhilip Donnelly
Photo from Railroad Gazette May 6, 1904
|
|
The Trestle84 views
|
|
Track Elevation of the Pennsylvania in Newark, N. J.79 viewsPDF from Railroad Gazette May 6, 1904
|
|
|
|
|
|